04 / CAPABILITY

Power BI &
Data Analytics

Turn business information
into a clearer view.

Bring operational data into useful dashboards. Agree the measures, connect suitable sources and give your team reports they can understand and use.

Operational insightConnected sourcesDefined measures
Imagined professional workstation overlooking an alpine lake
AJ Operations overviewFictional dataset · 4 weeks
Jobs12Sample operations
Completed7Across four weeks
Recorded209 hFrom the sample records
Review2Awaiting a person
Weekly recorded hoursZero baseline · 0–70 h
W1 · 30 hW2 · 57 hW3 · 64 hW4 · 58 h
Completed jobsWeekly totals: 0 / 2 / 4 / 1
Recorded effort by area
Manufacturing66 h
Food production65 h
Engineering78 h
12jobs
Completed · 7 In progress · 3 In review · 2
FROM SOURCE TO REPORTInformation with context.

Defined measures · traceable records

USEFUL OPERATIONAL CONTEXT12 jobs · 4 weeks · 3 areas

Fictional figures, reconciled to sample records.

Illustrative dashboard · fictional operational data

Information, with a purpose

From scattered sources.
To shared understanding.

A report is useful when people understand what the numbers mean and what to do next. Start with the decision, then work back to the data.

01 / Workload

What needs our attention?

Make job status, review queues and operational priorities easier to discuss.

02 / Process

What is changing over time?

Follow agreed measures and process trends without losing the context behind them.

03 / Understanding

Can we explain the measure?

Agree definitions, source data and checks, so the team reads the same report the same way.

An operational view, made tangible

See the detail.
Keep the bigger picture.

A fictional small-operations dataset spanning manufacturing, food production and engineering. Explore the filters, then inspect the source behind the measures.

Operations / Power BI-style report conceptIllustrative interface · fictional data
AJ / Reporting conceptOverview · Workload · Measures
Filter the fictional report by workstream. The filters work; this is not a live Power BI report.
Operational overview

All operations

Fictional four-week sample
Scheduled jobs
12
In this sample
Completed
7
Of 12 scheduled jobs
Awaiting review
2
A visible decision queue
Recorded hours
209
240 h planned, including unfinished work
  • Completed 7
  • In progress 3
  • Awaiting review 2
Recorded hours over time

Four sample weeks · 209 recorded hours in this view

Recorded hours by sample weekFictional data: week 1: 30 recorded hours; week 2: 57 recorded hours; week 3: 64 recorded hours; week 4: 58 recorded hours. Total 209 hours. The vertical scale is zero to 70 hours, not a productivity rate.
  1. W130 h
  2. W257 h
  3. W364 h
  4. W458 h
View weekly hours as a table
Fictional recorded hours by week. Same records and filter as the report.
Sample weekRecorded hours
Week 130
Week 257
Week 364
Week 458
Total209

Hours show the recorded workload, not achieved efficiency or a business result.

Completed jobs by week
  1. 0W1
  2. 2W2
  3. 4W3
  4. 1W4

Counts sum to 7 completed jobs.

Recorded / planned hours
  • Manufacturing66 / 76 h
  • Food production65 / 76 h
  • Engineering78 / 88 h

Planning context, not a productivity or efficiency rate.

Work needing a next step

5 open or review jobs · completed jobs excluded
  1. M-103Manufacturing
    In progress10 / 18 h recorded / planned
  2. M-104Manufacturing
    Awaiting review12 / 14 h recorded / planned
  3. F-204Food production
    In progress12 / 20 h recorded / planned
  4. E-302Engineering
    In progress16 / 24 h recorded / planned
  5. E-304Engineering
    Awaiting review13 / 16 h recorded / planned
View fictional source data · 12 jobs
Four-week sample. Recorded hours are the sum of W1–W4. All figures are fictional.
JobWorkstreamStatusCompleted weekPlan hW1 hW2 hW3 hW4 hRecorded h
M-101ManufacturingCompletedW22412110023
M-102ManufacturingCompletedW3200912021
M-103ManufacturingIn progress—18006410
M-104ManufacturingAwaiting review—140001212
F-201Food productionCompletedW216870015
F-202Food productionCompletedW32201010020
F-203Food productionCompletedW418009918
F-204Food productionIn progress—200001212
E-301EngineeringCompletedW32810128030
E-302EngineeringIn progress—24008816
E-303EngineeringCompletedW3200811019
E-304EngineeringAwaiting review—160001313
Total24030576458209
Operational overview

Manufacturing

Fictional four-week sample
Scheduled jobs
4
In this sample
Completed
2
Of 4 scheduled jobs
Awaiting review
1
A visible decision queue
Recorded hours
66
76 h planned, including unfinished work
  • Completed 2
  • In progress 1
  • Awaiting review 1
Recorded hours over time

Four sample weeks · 66 recorded hours in this view

Recorded hours by sample weekFictional data: week 1: 12 recorded hours; week 2: 20 recorded hours; week 3: 18 recorded hours; week 4: 16 recorded hours. Total 66 hours. The vertical scale is zero to 70 hours, not a productivity rate.
  1. W112 h
  2. W220 h
  3. W318 h
  4. W416 h
View weekly hours as a table
Fictional recorded hours by week. Same records and filter as the report.
Sample weekRecorded hours
Week 112
Week 220
Week 318
Week 416
Total66

Hours show the recorded workload, not achieved efficiency or a business result.

Completed jobs by week
  1. 0W1
  2. 1W2
  3. 1W3
  4. 0W4

Counts sum to 2 completed jobs.

Recorded / planned hours
  • Manufacturing66 / 76 h

Planning context, not a productivity or efficiency rate.

Work needing a next step

2 open or review jobs · completed jobs excluded
  1. M-103Manufacturing
    In progress10 / 18 h recorded / planned
  2. M-104Manufacturing
    Awaiting review12 / 14 h recorded / planned
View fictional source data · 4 jobs
Four-week sample. Recorded hours are the sum of W1–W4. All figures are fictional.
JobWorkstreamStatusCompleted weekPlan hW1 hW2 hW3 hW4 hRecorded h
M-101ManufacturingCompletedW22412110023
M-102ManufacturingCompletedW3200912021
M-103ManufacturingIn progress—18006410
M-104ManufacturingAwaiting review—140001212
Total761220181666
Operational overview

Food production

Fictional four-week sample
Scheduled jobs
4
In this sample
Completed
3
Of 4 scheduled jobs
Awaiting review
0
A visible decision queue
Recorded hours
65
76 h planned, including unfinished work
  • Completed 3
  • In progress 1
  • Awaiting review 0
Recorded hours over time

Four sample weeks · 65 recorded hours in this view

Recorded hours by sample weekFictional data: week 1: 8 recorded hours; week 2: 17 recorded hours; week 3: 19 recorded hours; week 4: 21 recorded hours. Total 65 hours. The vertical scale is zero to 70 hours, not a productivity rate.
  1. W18 h
  2. W217 h
  3. W319 h
  4. W421 h
View weekly hours as a table
Fictional recorded hours by week. Same records and filter as the report.
Sample weekRecorded hours
Week 18
Week 217
Week 319
Week 421
Total65

Hours show the recorded workload, not achieved efficiency or a business result.

Completed jobs by week
  1. 0W1
  2. 1W2
  3. 1W3
  4. 1W4

Counts sum to 3 completed jobs.

Recorded / planned hours
  • Food production65 / 76 h

Planning context, not a productivity or efficiency rate.

Work needing a next step

1 open or review jobs · completed jobs excluded
  1. F-204Food production
    In progress12 / 20 h recorded / planned
View fictional source data · 4 jobs
Four-week sample. Recorded hours are the sum of W1–W4. All figures are fictional.
JobWorkstreamStatusCompleted weekPlan hW1 hW2 hW3 hW4 hRecorded h
F-201Food productionCompletedW216870015
F-202Food productionCompletedW32201010020
F-203Food productionCompletedW418009918
F-204Food productionIn progress—200001212
Total76817192165
Operational overview

Engineering

Fictional four-week sample
Scheduled jobs
4
In this sample
Completed
2
Of 4 scheduled jobs
Awaiting review
1
A visible decision queue
Recorded hours
78
88 h planned, including unfinished work
  • Completed 2
  • In progress 1
  • Awaiting review 1
Recorded hours over time

Four sample weeks · 78 recorded hours in this view

Recorded hours by sample weekFictional data: week 1: 10 recorded hours; week 2: 20 recorded hours; week 3: 27 recorded hours; week 4: 21 recorded hours. Total 78 hours. The vertical scale is zero to 70 hours, not a productivity rate.
  1. W110 h
  2. W220 h
  3. W327 h
  4. W421 h
View weekly hours as a table
Fictional recorded hours by week. Same records and filter as the report.
Sample weekRecorded hours
Week 110
Week 220
Week 327
Week 421
Total78

Hours show the recorded workload, not achieved efficiency or a business result.

Completed jobs by week
  1. 0W1
  2. 0W2
  3. 2W3
  4. 0W4

Counts sum to 2 completed jobs.

Recorded / planned hours
  • Engineering78 / 88 h

Planning context, not a productivity or efficiency rate.

Work needing a next step

2 open or review jobs · completed jobs excluded
  1. E-302Engineering
    In progress16 / 24 h recorded / planned
  2. E-304Engineering
    Awaiting review13 / 16 h recorded / planned
View fictional source data · 4 jobs
Four-week sample. Recorded hours are the sum of W1–W4. All figures are fictional.
JobWorkstreamStatusCompleted weekPlan hW1 hW2 hW3 hW4 hRecorded h
E-301EngineeringCompletedW32810128030
E-302EngineeringIn progress—24008816
E-303EngineeringCompletedW3200811019
E-304EngineeringAwaiting review—160001313
Total881020272178
One consistent dataset. Several useful questions.

12 fictional jobs, 7 completed, 3 in progress and 2 awaiting review. Recorded hours total 209; planned hours total 240. Filters, charts and source tables use the same records. This is not client work or an achieved business result.

Practical deliverables

A useful report.
A sound foundation.

The work behind a dashboard matters. Agree the questions, source systems, definitions and responsibilities before the build begins.

  1. 01

    Prepare the information.

    Review available data, quality and access. Clean and organise the agreed sources, with a data model suited to the reporting needs.

  2. 02

    Design the report and measures.

    Develop Power BI pages, calculations, filters and visualisations around useful business questions and readable everyday use.

  3. 03

    Validate with the people using it.

    Check measures against source records, review exceptions and agree how definitions, assumptions and limitations are documented.

  4. 04

    Make refresh and handover clear.

    Agree refresh arrangements, access, ownership and licensing requirements. Explain how to read, maintain and review the report.

From question to handover

Understand.
Model. Validate. Explain.

Work with the people who know the operation. A good handover includes the meaning behind the report, not just access to a dashboard.

  1. 01

    Define

    Agree the reporting questions, data sources and useful measures.

    A shared reporting brief
  2. 02

    Build

    Prepare the data model, report pages and agreed calculations.

    A working report for review
  3. 03

    Validate

    Reconcile source records, definitions and the user experience.

    Documented checks & limitations
  4. 04

    Hand over

    Explain use, refresh, access and maintenance responsibilities.

    Guidance & practical next steps

Clarity beyond the dashboard

Know the source.
Understand the report.

Discuss data quality, permissions, refresh and licensing before promising how a report will operate.

Our approach, in detail
Can our current systems be connected?

We first review the source systems, available data, permissions and practical requirements. Suitable connections are scoped after that review; automatic integration is not assumed.

How often will the data refresh?

Refresh arrangements depend on the data sources, access, tooling and agreed needs. We discuss the practical setup, responsibilities and limitations before implementation.

What do we receive at handover?

The agreed report, measure definitions, validation notes and guidance on use, access and refresh responsibilities. Ongoing changes and support can be discussed separately, with costs and ownership made clear.

A useful place to start

Make your data
easier to use.

Tell us which questions are hard to answer and where the data lives. We’ll discuss a report that could make the next decision clearer.

Original illustrative landscape